The delayed coking unit (DCU) and tar-deasphalting unit (SDA) on Turkmenbashi Complex of Oil Refineries – Completion of the construction.
Integration of a Needle Coke Production Unit into the Delayed Coking Unit at Turkmenbashi Oil Refinery – Pre-design study and technology development.
Turnkey construction of a new atmospheric oil distillation unit with an electric desalination Unit-6 with a capacity of 1 million tons per year at the Seydi Oil Refinery, Turkmenistan – Pre-design study, conceptual and detailed design.
The catalytic reforming unit (CRU-35-11/1000) at the Seydi Oil Refinery, Turkmenistan – Conceptual design and reconstruction.
Paving Bitumen Production Unit at Seydi Oil Refinery – Turnkey conceptual Design and Construction.
Construction of the delayed coking unit for OJSC “Ufaneftekhim” in partnership with LLC “Informtechnology” – Scoping study, conceptual design and detailed engineering.
Reconstruction of the K-201 distillation column of the thermal cracking unit for “LUKOIL Neftohim Burgas AD” in partnership with LLC “Informtechnology” – Scoping study and conceptual design.
The unit for trapping the products of heating, steaming and cooling from the coke drums of the unit 21-10/7 (No. 60) LLC “LUKOIL-Volgogradneftepererabotka” in partnership with LLC “Informtechnology” – Reconstruction
Modernization of the coking unit at the “Novo-Ufimsky Refinery” – Scoping study and conceptual design.
Delayed coking unit (DCU-3) with an increase in its productivity at the Turkmenbashi complex of oil refineries – Turnkey modernization.