TURKMENBASHI OIL REFINERY

The delayed coking unit (DCU) and tar-deasphalting unit (SDA) on Turkmenbashi Complex of Oil Refineries – Completion of the construction.

  1. Project Name: Completion of the construction of the delayed coking unit (DCU) and tar-deasphalting (SDA) unit.
  2. Project Brief Description: Completion of the construction of the delayed coking unit and tar-deasphalting (SDA) unit.
  3. Project Location: Turkmenbashi, Turkmenistan
  4. Timeframe (Start and End Date):2019 — 2022
  5. Customer: Turkmenbashi Complex of Oil Refineries
  6. Licensor: Westport Trading Europe Limited
  7. Design Engineer: State Unitary Enterprise “Bashgiproneftechim”
  8. Project Outcome: The project will allow producing up to 900 thousand tons per year of product at the ultrasonic testing unit and up to 500 thousand tons per year – at the SDA installation.
2019

TURKMENBASHI OIL REFINERY

Integration of a Needle Coke Production Unit into the Delayed Coking Unit at Turkmenbashi Oil Refinery – Pre-design study and technology development.

  1. Project Name: Scoping Study and Technology Design for Integration of a Needle Coke Production Unit into the Delayed Coker.
  2. Project Brief Description: Scoping Study and Technology Design for Integration of a Needle Coke Production Unit into the Delayed Coker.
  3. Project Location: Turkmenbashi, Turkmenistan
  4. Timeframe (Start and End Date):2019 — 2020
  5. Customer: Turkmenbashi Complex of Oil Refineries
  6. Licensor: WOOD, Westport Trading Europe Limited
  7. Design Engineer: State Unitary Enterprise “Bashgiproneftechim”
  8. Project Outcome: Prepared development documentation of technology for Integration needle coke production unit to the Delayed Coking Unit (DCU)
2019

SEYDI OIL REFINERY

Turnkey construction of a new atmospheric oil distillation unit with an electric desalination Unit-6 with a capacity of 1 million tons per year at the Seydi Oil Refinery, Turkmenistan – Pre-design study, conceptual and detailed design.

  1. Project Name: Scoping study for construction of the New Crude Vacuum Desalination Unit-6 with a capacity of 1 million tons per year.
  2. Project Brief Description: The reconstruction includes distribution of the feed and the product streams, readjustment of the operation circuit of the existing equipment and its partial replacement with more efficient hardware.
  3. Project Location: Seydi, Turkmenistan
  4. Timeframe (Start and End Date): 2016-2019
  5. Customer: Turkmenbashi Complex of Oil Refineries
  6. Design Engineer: State Unitary Enterprise “Bashgiproneftechim”
  7. Project Outcome: A detailed report and a proposal for the reconstruction were prepared to facilitate continuous operation of the unit, provide the facility with a stable supply of feed of a required quality, increase the production of diesel fuel by maximizing precision of the rectification process, integrate modern energy-saving technologies and maintain an optimal technological mode by using automated distribution process control system
2014 - 2016

SEYDI OIL REFINERY

The catalytic reforming unit (CRU-35-11/1000) at the Seydi Oil Refinery, Turkmenistan – Conceptual design and reconstruction.

  1. Project Name: Scoping study, conceptual design, detailed engineering for modernization of the catalytic reforming unit and construction of the dearomatization unit at the SOR.
  2. Project Brief Description: Modernization of the catalytic reforming unit and the construction of the dearomatization unit.
  3. Project Location: Seydi, Turkmenistan
  4. Timeframe (Start and End Date): 2014-2017
  5. Customer: Seydi Oil Refinery
  6. Licensor: LLC “Informtechnology”
  7. Design Engineer: State Unitary Enterprise “Bashgiproneftechim”
  8. Project Outcome: The project allowed producing the EURO brand gasoline at the refinery and completed the construction of the dearomatization unit to generate extraction gasoline for the production of cottonseed oil.
2014

SEYDI OIL REFINERY

Paving Bitumen Production Unit at Seydi Oil Refinery – Turnkey conceptual Design and Construction.

  1. Project Name: Scoping study, conceptual design, detailed engineering project and construction of the bitumen unit at the Seydi Oil Refinery (SOR).
  2. Project Brief Description: Construction of the bitumen unit to facilitate the production of high-quality petroleum road bitumen.
  3. Project Location: Seydi, Turkmenistan
  4. Timeframe (Start and End Date): 2012-2014
  5. Customer: Seydi Oil Refinery
  6. Licensor: Westport Trading Europe Limited, LLC “Informtechnology”
  7. Design Engineer: State Unitary Enterprise “Bashgiproneftechim”
  8. Project Outcome: Construction of the facility allowed yielding 37.2 thousand tons of high-quality bitumens of various grades from different primary feeds produced at the oil refineries of Turkmenistan.
2010

UFANEFTEKHIM

Construction of the delayed coking unit for OJSC “Ufaneftekhim” in partnership with LLC “Informtechnology” – Scoping study, conceptual design and detailed engineering.

  1. Project Name: Scoping study, conceptual design, detailed engineering project for the construction of the delayed coking unit for OJSC “Ufaneftekhim”.
  2. Project Brief Description: We developed and implemented a proposal for the reconstruction of the DCU for OJSC “Ufaneftekhim”.
  3. Project Location: Ufa, Russian Federation
  4. Timeframe (Start and End Date): 2010
  5. Customer: OJSC “Ufaneftekhim”
  6. Licensor: LLC “Informtechnology”, Russian Federation
  7. Design Engineer: State Unitary Enterprise “Bashgiproneftechim”
  8. Project Outcome: Completion of the delayed coking unit with the production capacity of 1.2 million of tons of high-quality cumulative petroleum coke. The performed research and the designed proposal enabled to increase the feedstock throughput capacity up to 1.6 million tons per year.
2010

LUKOIL NEFTOKHIM BURGAS AD

Reconstruction of the K-201 distillation column of the thermal cracking unit for “LUKOIL Neftohim Burgas AD” in partnership with LLC “Informtechnology” – Scoping study and conceptual design.

  1. Project Name: Scoping study and conceptual design for reconstruction of the K-201 distillation column of the thermal cracking unit for “LUKOIL Neftohim Burgas AD”.
  2. Project Brief Description: Performing the design work and the related services for the development of the project documentation for the reconstruction of the K-201 distillation column of the thermal cracking unit for “LUKOIL Neftohim Burgas AD”.
  3. Project Location: Burgas, Bulgaria
  4. Timeframe (Start and End Date): 2010
  5. Customer: LUKOIL Neftohim Burgas AD
  6. Licensor: LLC “Informtechnology”, Russian Federation
  7. Design Engineer: “Bashneftechimmash”, Russian Federation
  8. Project Outcome: The column reconstruction was completed along with enhancement of the quality of by-products and fuel oil.
2009

LUKOIL VOLGOGRAD-OIL REFINING

The unit for trapping the products of heating, steaming and cooling from the coke drums of the unit 21-10/7 (No. 60) LLC “LUKOIL-Volgogradneftepererabotka” in partnership with LLC “Informtechnology” – Reconstruction

  1. Project Name: Reconstruction of the unit for trapping the products of heating, steaming and cooling from the coke drums of the unit 21-10/7 (No. 60) LLC “LUKOIL-Volgogradneftepererabotka”.
  2. Project Brief Description:
    Development of the design basis for the reconstruction of the above-mentioned unit.
  3. Project Location: Volgograd, Russian Federation
  4. Timeframe (Start and End Date): 2009
  5. Customer: LLC “LUKOIL-Volgogradneftepererabotka”
  6. Licensor: LLC “Informtechnology”, Russian Federation
  7. Design Engineer: State Unitary Enterprise “Bashgiproneftechim”
  8. Project Outcome: The quality of the product was upgraded along with reducing the environmental impact of the production.
2009

NOVO-UFIMSKY REFINERY

Modernization of the coking unit at the “Novo-Ufimsky Refinery” – Scoping study and conceptual design.

  1. Project Name: Scoping study and conceptual design on modernization of the coking unit at the “Novo-Ufimsky Refinery”.
  2. Project Brief Description: The studies were performed to assess the production capacities of the 21-10 unit owned by OJSC “Novo-Ufimsky Refinery”.
  3. Project Location: Ufa, Russian Federation
  4. Timeframe (Start and End Date): 2008-2009
  5. Customer: Novo-Ufimsky Refinery
  6. Licensor: LLC “Informtechnology”, Russian Federation
  7. Design Engineer: JSC “Vostokneftezavodmontazh”
  8. Project Outcome: Continuous production of petroleum coke with a minimum content of volatile substances of 16% for use as a charge additive in the coking industry was organized to replace the coking coal which is of a very short supply in Russia.
2003

TURKMENBASHI OIL REFINERY

Delayed coking unit (DCU-3) with an increase in its productivity at the Turkmenbashi complex of oil refineries – Turnkey modernization.

  1. Project Name: Modernization of the delayed coking unit at the Turkmenbashi Complex of Oil Refineries (TCOR).
  2. Project Brief Description: The delayed coking unit of the Turkmenbashi Complex of Oil Refineries (TCOR) was modernized using the corporation’s own patented technology and with its immediate participation.
  3. Project Location: Turkmenbashi, Turkmenistan
  4. Timeframe (Start and End Date): 2002-2003
  5. Customer: Turkmenbashi Complex of Oil Refineries
  6. Licensor: Westport Trading Europe Limited, State Unitary Enterprise “Bashgiproneftechim”
  7. Design Engineer: State Unitary Enterprise “Bashgiproneftechim”, Russian Federation
  8. Project Outcome: The modernization resulted in a doubled power capacity of the delayed coking unit (DCU-3) reaching 900-1000 thousand MT. The DCU-3 project has paid off in record time.